Case Study 03 · Charlotte, North Carolina
Commercial Sealant Takeoff — Charlotte, NC
Division 07 Quantity Takeoff & Estimating
A detailed Division 07 takeoff covering multiple sealant conditions across plans, roof plans, elevations and door details.
The Assignment
What We Performed
Detailed takeoff covering backer rod and sealant, parapet capping sealant, expansion joints, wall-junction sealant, acoustical sealant, internal-door sealant, and masonry control joints.
Scope Covered
- Backer rod & sealant
- Parapet capping sealant
- Expansion joints
- Wall-junction sealant
- Acoustical sealant
- Internal-door sealant
- Masonry control joints
- Plan / roof / elevation details
What the Client Received
What the Client Received
Detailed Excel BOQ, organized quantities, labor and material pricing structure, and color-coded PDF markups covering floor plans, roof plans, elevations and door details.
Excel BOQ
Detailed quantities organized for Division 07 review.
Quantity Structure
Sealant conditions separated by application and location.
Pricing Framework
Labor and material pricing structure prepared for estimating.
Color Markups
PDF markups across plans, roof plans, elevations and door details.
Estimating Output
See the Work Behind the Numbers.
Representative trade-output visuals from the supplied archive.
Review a Division 07 Sample
Request a relevant sealant takeoff example to review how measured conditions, quantities and markups are organized.
How the Package Is Used
From Quantity Review to Bid Preparation.
These deliverables are designed to fit the contractor’s estimating process — providing a traceable quantity base, visual scope review and structured information for pricing or quotation.
Need This Level of Detail?
Send Us Your Plans and Scope.
We’ll review the documents, confirm what should be measured and provide fee and turnaround before starting.