Send the Project
Plans, trade scope, bid due date and project notes.
Preconstruction
Available upon request. Use preliminary estimating to test budget direction, feasibility and early design decisions. Budget pricing includes assumptions, allowances and exclusions; it is not a final bid price.

Service Overview
Budget / Preliminary Cost Estimating supports early planning rather than claiming guaranteed final pricing. The estimate should clearly identify the information available, assumptions, allowances, exclusions and other limitations that affect the result.
What’s Included
The exact output is confirmed for the project before estimating begins. Typical elements include:
How It Works
Plans, trade scope, bid due date and project notes.
We review the information and confirm fee, scope and turnaround.
The agreed takeoff, calculations and documentation are prepared.
Deliverables pass through the internal QA workflow before delivery.
Who This Is For
Early design and feasibility reviews
Owners and builders testing project budget direction
GCs preparing preliminary client pricing
Projects where the final scope is still developing
Service FAQ
No. Budget pricing is preliminary and may change with final drawings, supplier pricing, labor productivity, site conditions, equipment and subcontractor quotations.
Yes, when enough project information exists to define reasonable assumptions. The level of confidence depends on the available design information.
Yes. Assumptions, allowances, exclusions and important limitations should be documented so the estimate can be interpreted correctly.
Yes. As design information matures, the work can be updated and expanded into a detailed takeoff and construction estimate.
Remote Estimating Process
All estimating and quantity takeoff services are provided 100% remotely throughout the United States. We do not perform site visits.
When cost estimating is requested, we use RSMeans Data as one of our primary sources for location-specific material and labor pricing. Inputs are selected for the project’s city/state and adjusted as appropriate for specifications, trade requirements, quantities, construction type and information supplied by the client.
A quantity-only takeoff does not include cost pricing unless it is part of the agreed scope.
Depending on the agreed service and trade, deliverables may include a quantity takeoff / BOQ, material quantities, labor quantities or hours, drawing markups, trade breakdowns, inclusions and exclusions, and assumptions and clarifications. Material and labor costs are included when requested; 3D views are optional where applicable.
Missing or unclear information can be recorded as assumptions and exclusions. We confirm the scope and deliverables from the documents received before work begins.
Prepared using professional estimating tools including PlanSwift, Bluebeam, CostX and BuildSoft Cubit. See our service process and available support →
Have a Project to Bid?
Tell us the trade, bid due date and project requirements. We’ll confirm scope, fee and turnaround before work begins.