Projects / Case Studies

Case Study 02 · Washington, DC

Building Renovation & Conversion — Washington, DC

Full GC Quantity Takeoff & Cost Estimate | 3,362 SF

A full renovation estimate organized across multiple CSI scopes, pricing alternates and contractor-ready bid review.

Renovation / Multi-Trade estimating output
Renovation / Multi-Trade takeoff detail
Project-specific supplied materials
Project TypeBuilding Renovation / Conversion
LocationWashington, DC
TradeFull General Contractor / Multi-Trade
Project SizeApprox. 3,362 SF

The Assignment

What We Performed

Complete multi-trade quantity takeoff and construction estimate covering demolition, concrete, masonry, structural framing, roofing, exterior finishes, doors and windows, partitions, flooring, fire protection, electrical, and other GC scopes.

Scope Covered

  • Demolition
  • Concrete & masonry
  • Structural framing
  • Roofing & exterior finishes
  • Doors & windows
  • Partitions & flooring
  • Fire protection
  • Electrical & other GC scopes

What the Client Received

What the Client Received

Detailed BOQ, color-coded PDF markups, labor-hour calculations, material and labor pricing, CSI division cost breakdown, Base Bid, six pricing alternates, and overall project cost summary.

01

Detailed BOQ

Organized multi-trade quantities for review and pricing.

02

Labor + Pricing

Labor-hour calculations plus material and labor pricing.

03

CSI Cost Breakdown

Cost structure organized by CSI division for bid review.

04

Bid + Alternates

Base Bid, six pricing alternates and overall cost summary.

How the Package Is Used

From Quantity Review to Bid Preparation.

These deliverables are designed to fit the contractor’s estimating process — providing a traceable quantity base, visual scope review and structured information for pricing or quotation.

01Review measured scope
02Check quantities against markups
03Apply or review pricing
04Prepare the contractor’s final bid

Need This Level of Detail?

Send Us Your Plans and Scope.

We’ll review the documents, confirm what should be measured and provide fee and turnaround before starting.