Case Study 01 · Kensington, Maryland
Residential Addition & Renovation — Kensington, MD
Full GC Quantity Takeoff & Cost Estimate | 3,249 SF
A complete multi-trade takeoff and detailed cost estimate covering the project from demolition through MEP and finishes.


The Assignment
What We Performed
Complete quantity takeoff and detailed construction cost estimate covering demolition, concrete, foundations, masonry, framing, roofing, doors and windows, finishes, plumbing, HVAC, electrical, and other GC scopes.
Scope Covered
- Demolition
- Concrete & foundations
- Masonry
- Framing
- Roofing
- Doors & windows
- Finishes
- Plumbing / HVAC / Electrical
What the Client Received
What the Client Received
Detailed Excel BOQ, labor-hour calculations, material and labor pricing, cost breakdown by trade, Base Bid and Alternates, overall cost summary, and color-coded PDF takeoff markups.
Excel BOQ
Detailed, organized quantities by trade and scope.
Labor + Pricing
Labor-hour calculations with material and labor pricing.
Bid Structure
Cost breakdown by trade, Base Bid and Alternates.
Marked Drawings
Color-coded PDF takeoff markups plus overall cost summary.
Estimating Output
See the Work Behind the Numbers.
Project-specific supplied materials.



How the Package Is Used
From Quantity Review to Bid Preparation.
These deliverables are designed to fit the contractor’s estimating process — providing a traceable quantity base, visual scope review and structured information for pricing or quotation.
Need This Level of Detail?
Send Us Your Plans and Scope.
We’ll review the documents, confirm what should be measured and provide fee and turnaround before starting.